When choosing hanging bag systems, people should inspect the software development team of the manufacturers in addition to the design team. The layout, height, and habits of different laundry factories are all different so the control system for each bag in the laundry factory needs to be written individually by a software engineer. All devices need communication data docking to achieve centralized control. As a result, the design and development team and software development team must cooperate with each other, otherwise, it is very difficult for the bag system to run smoothly and reflect intelligence well.
Programming
In the laundry factory with a hanging bag system, the linens are in the air. The front bags need to send dirty linen to the tunnel washer and the back hanging bag will convey the clean linen to the dryers or designated post-finishing area. The seemingly simple action actually concluded a lot of details. In operation, the hanging bag generally needs to go through several links such as lifting, running, turning, blanking, flipping, and empty bag return, and each action process needs to be controlled by a program.

● The hanging bag of CLM is realized by gravity and inertia through the altitude difference of the orbit during operation. Therefore, the front hanging bag, the tunnel washer system, the rear hanging bag, and the post-finishing equipment need to do a good job of connecting the process, running smoothly and without any deviation. This is a relatively high requirement for the intelligent automation of the system, which requires software engineers to control the work rhythm of the whole factory and have accurate computing capabilities.
Testing and Adjusting
When the track and electrical lines of the hanging bag system in the laundry factory are installed, software engineers are required to test and adjust on-site in order to truly match the working rhythm of the factory. The hardware determines the durability and stability of the equipment, and the software determines whether the bag runs smoothly. The close connection between equipment and equipment and the close connection between equipment and labor is indispensable.
Conclusion
Therefore, when choosing a hanging bag system manufacturer, it is also necessary to pay attention to whether the manufacturer has a professional software engineering team.
Post time: Dec-17-2024